Tuesday, 10 February 2009

Brand new shiny blog to document the MASSIVE project that is our house !

We moved in on November 28th 2008 after 11 months of HELL in a collapsing housing market !

Currently abiding in the "project" are Clare (me), Sam(Hubby), B (7 yr old), E(6 yr old) and The Bear(2 yrold )

The house is only 20 years old but has been sadly neglected during that time and scarily boasts all the original features ! The only room that is virtually done is the kitchen which was newly fitted a couple of years ago so the only work needed in there is a bit of glossing. There was also two sinks in there which was not only bizarre but completely unnecessary so one has been removed and a new piece of worktop put in.

The rest of the house needs the following:

  • Downstairs WC currently is blue. Needs white wc and sink, re-tiling and woodowork glossing
  • Hall / Stairs / Landing redecorating - gloss all wood which is currently dark wood stain.
  • Bathroom - new suite and re-tile
  • En-suite - new toilet and sink and re-tile. Install shower.
  • Landscape garden.
  • Lounge - currently a lounge / diner which needs splitting into two.
  • Plaster the exposed brick "feature walls" in lounge and dining room.
  • Remove fireplace and install new fire
  • New Boiler
  • New windows all through

The house is completely fine to live in so no major time deadlines - although the colour of the entire house does cause migraines !

Previous owners "decorated" in order to sell but believe me you have NEVER seen anything like it unless you have allowed small children to emulsion or gloss ? There is emulsion all over the ceiling and then huge patches not done at all !